Document Library

Public Consultation Documents 

Environmental Study Report (ESR) Addendum 

Public Consultation on the Detailed Design (30%) 

Environmental Study Report 

On June 18, 2014, Northumberland County Council endorsed the recommendation of an Environmental Assessment (EA) study to:

  1. Build a new bridge across the Trent River in Campbellford between Second Street and Alma Street
  2. Plan to replace the existing Bridge Street bridge at the end of its structural lifespan in about 30 years.

Environmental Study Report

In June 2017, the Minister of the Environment and Climate Change approved the Environmental Assessment. For a copy of the approval documentation, please submit a request using our Document Request Form.