Document Library
Public Consultation Documents
Environmental Study Report (ESR) Addendum
Public Consultation on the Detailed Design (30%)
- Virtual Q&A Session 1 (July 28, 2020)
- Virtual Q&A Session 2 (August 13, 2020)
- Virtual Q&A Session Presentation
- Public Consultation Summary Report
Environmental Study Report
On June 18, 2014, Northumberland County Council endorsed the recommendation of an Environmental Assessment (EA) study to:
- Build a new bridge across the Trent River in Campbellford between Second Street and Alma Street
- Plan to replace the existing Bridge Street bridge at the end of its structural lifespan in about 30 years.
Environmental Study Report:
- Environmental Study Report
- Appendices 1 and 2
- Appendix 3
- Appendices 4 to 8
- Appendices 9, 10, 12 and 13
- Appendix 11
In June 2017, the Minister of the Environment and Climate Change approved the Environmental Assessment. For a copy of the approval documentation, please submit a request using our Document Request Form.
Additional Documents
- Expanded Environmental Noise Assessment Report – June 2013
- Implementation Plan, Trent River Crossing and Arterial Road Network Report – November 2017
Contact Us
Denise Marshall, P.Eng.
Manager, Project Engineering
905-372-3329 or 1-800-354-7050 ext. 2429
Brian Ruck, P.Eng.
Project Manager, GHD
905-429-4957